(RFQ) Renovation of the Global Fund Warehouse in Kanifing 142 views
Job Overview
RENOVATION WORKS AT CRS WAREHOUSE ONE AND THE EXTERNAL OFFICE
Item Description
SITE CLEARANCE
A Removal of the existing roof and ceiling to the security office and cart away including the removal of the affected roofing sheets.
B The clearance of the ware house
WALL FINISHES
cement/sand (1:3 mix) to crack walls
C Make good finishing to affected crack walls to the ware house
ROOF
D 50 x 75mm thick treated hardwood timber purlins nailed to steel roof trusses
COVERING
E 0.50mm Aluzinc Profile roof coverings fixed to replace the affected area of the ware house
F 0.40mm Aluzinc Profile roof coverings fixed security house
G Ridge cap
H 200 x 25mm thick softwood timber fascia board
I cost to repair the entrance shade
SUSPENDED CEILING
J Provide and fix 6mm plywood ceiling boards
K 50x50mm ceiling joist and noggings
L 1’x2” timber mouldings at 600x600mm centres grid system
PAINTING
M Prepare and apply paint to internal and external walls of the warehouse
N Prepare and apply paint to internal and external walls of the security office
O Prepare and apply paint to the entrance gate and the ware house door
P floor tiles to the security including skirting
Q Cost on for the concrete apron wash stone
R Entrance ramp to accass the ware house Basalt concrete
S Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose
T Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence
U Concrete to affected floor area basalt
TOTAL WHARE HOUSE 1 CARRIED TO MAIN SUMMARY
RENOVATION WORKS AT CRS WAREHOUSE TWO
Item Description
SITE CLEARANCE
A Removal of the affected roofing sheets, clearance of the ware house
CONCRETE TO CRACK WALLS
Reinforced in-situ concrete 25N/mm2 20mm aggregate size, bassalt
B Reinforced in-situ concrete (1:2:4 – 20mm aggr.) to columns, 250x250mm thick
C Ditto to affected floor area
REINFORCEMENT
D 10mm, to walls
FORMWORK/SHUTTERING
E to sides of walls
WALL FINISHES
cement/sand (1:3 mix) to new wall
F 12mm cement and sand (1:3 ) rendering on block
DOORS
G Replacement of the store door
H repare the security door
ROOF COVERING
I 0.50mm Aluzinc Profile roof coverings fixed with self-tapping screws to purlins (measured separately), measured net with no allowance made for laps AZ-120
J 0.40mm Aluzinc Profile roof coverings fixed to the security house
K Ridge cap
PAINTING
L Prepare and apply paint to internal and external walls of the warehouse
M Prepare and apply paint to internal and external walls of the security office
N Prepare and apply paint to the entrance gate
O floor tiles to the security including skirting
P Cost on for the concrete apron wash stone
Q Entrance ramp to accass the ware house Basalt concrete
R Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose
S Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence
T Cost on the entrance roof shed
TOTAL WHARE HOUSE 1 CARRIED TO MAIN SUMMARY
RENOVATION WORKS AT CRS WAREHOUSE THREE
Item Description
SITE CLEARANCE
A Removal of the affected roofing sheets, clearance of the ware house
CONCRETE TO CRECK WALLS
Reinforced in-situ concrete 25N/mm2 20mm aggregate size, basalt
Reinforced in-situ concrete (1:2:4 – 20mm aggr.) to columns, 250x250mm thick
Ditto to affected floor area
REINFORCEMENT
10mm, to walls
FORMWORK/SHUTTERING
to sides of walls
WALL FINISHES
Render; cement/sand (1:3 mix) to new wall
12mm cement and sand (1:3 ) rendering on block
DOORS
Replacement of the store door
Repair the security door
ROOF COVERING
0.50mm Aluzinc Profile roof coverings fixed with self-tapping screws to purlins (measured separately), measured net with no allowance made for laps AZ-120
0.50mm Aluzinc Profile roof coverings fixed security house
Ridge cap
PAINTING
Prepare and apply paint to internal and external walls of the warehouse
Prepare and apply paint to internal and external walls of the security office
Prepare and apply paint to the entrance gate
Floor tiles to the security including skirting
Cost on for the concrete apron wash stone
Entrance ramp to accass the ware house Basalt concrete
Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose
Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence
Cost on the entrance roof shed
TOTAL WHARE HOUSE 3 CARRIED TO MAIN SUMMARY
RENOVATION WORKS OF WAREHOUSE FINAL SUMMARY
Item Description
1 TOTAL WHARE HOUSE 1
2 TOTAL WHARE HOUSE 2
3 TOTAL WHARE HOUSE 3
TOTAL WHARE HOUSE 3 CARRIED TO FINAL SUMMARY
Deadline: 6th November 2026.