Hotline:( call/whatsapp)+220833533578

(RFQ) Renovation of the Global Fund Warehouse in Kanifing 142 views

Job Overview

RENOVATION WORKS AT CRS WAREHOUSE ONE AND THE EXTERNAL OFFICE

Item Description

SITE  CLEARANCE
A Removal of the existing roof and ceiling to the security office and cart away including the removal of the affected roofing sheets.
B The clearance of the ware house

WALL FINISHES

cement/sand (1:3 mix) to crack  walls
C Make good finishing to affected crack walls to the ware house

ROOF

D 50 x 75mm thick treated hardwood timber purlins nailed to steel roof trusses

COVERING

E 0.50mm Aluzinc Profile roof coverings fixed to replace the affected area of the ware house
F 0.40mm Aluzinc Profile roof coverings fixed security house
G Ridge cap
H 200 x 25mm thick softwood timber fascia board
I cost to repair the entrance shade

SUSPENDED CEILING

J Provide and fix 6mm plywood ceiling boards
K 50x50mm ceiling joist  and noggings
L 1’x2” timber mouldings at 600x600mm centres grid system

PAINTING

M Prepare and apply paint to internal and external walls of the warehouse
N Prepare and apply paint to internal and external walls of the security office
O Prepare and apply paint to the entrance gate and the ware house door
P floor tiles to the security including skirting
Q Cost on for the concrete apron wash stone
R Entrance ramp to accass the ware house Basalt concrete
S Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose
T Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence
U Concrete  to affected floor area basalt

TOTAL WHARE HOUSE 1 CARRIED TO MAIN SUMMARY 

RENOVATION WORKS AT CRS WAREHOUSE TWO

Item Description

SITE  CLEARANCE
A Removal of the affected roofing sheets,  clearance of the ware house

CONCRETE TO CRACK WALLS
Reinforced in-situ concrete 25N/mm2 20mm aggregate size, bassalt
B Reinforced in-situ concrete (1:2:4 – 20mm aggr.) to columns, 250x250mm thick
C Ditto to affected floor area

REINFORCEMENT
D 10mm, to walls

FORMWORK/SHUTTERING
E to sides of walls

WALL FINISHES

cement/sand (1:3 mix) to new wall
F 12mm cement and sand (1:3 ) rendering on block

DOORS

G Replacement of the store door
H repare the security door

ROOF COVERING

I 0.50mm Aluzinc Profile roof coverings fixed with self-tapping screws to purlins (measured separately), measured net with no allowance made for laps AZ-120
J 0.40mm Aluzinc Profile roof coverings fixed to the security house
K Ridge cap

PAINTING

L Prepare and apply paint to internal and external walls of the warehouse
M Prepare and apply paint to internal and external walls of the security office
N Prepare and apply paint to the entrance gate
O floor tiles to the security including skirting
P Cost on for the concrete apron wash stone
Q Entrance ramp to accass the ware house Basalt concrete
R Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose
S Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence
T Cost on the entrance roof shed

TOTAL WHARE HOUSE 1 CARRIED TO MAIN SUMMARY 

RENOVATION WORKS AT CRS WAREHOUSE THREE

Item Description

SITE  CLEARANCE

A Removal of the affected roofing sheets,  clearance of the ware house

CONCRETE TO CRECK WALLS

Reinforced in-situ concrete 25N/mm2 20mm aggregate size, basalt

Reinforced in-situ concrete (1:2:4 – 20mm aggr.) to columns, 250x250mm thick

Ditto to affected floor area

REINFORCEMENT
10mm, to walls

FORMWORK/SHUTTERING

to sides of walls

WALL FINISHES

Render; cement/sand (1:3 mix) to new wall

12mm cement and sand (1:3 ) rendering on block

DOORS

Replacement of the store door
Repair the security door

ROOF COVERING

0.50mm Aluzinc Profile roof coverings fixed with self-tapping screws to purlins (measured separately), measured net with no allowance made for laps AZ-120

0.50mm Aluzinc Profile roof coverings fixed security house

Ridge cap

PAINTING
Prepare and apply paint to internal and external walls of the warehouse

Prepare and apply paint to internal and external walls of the security office

Prepare and apply paint to the entrance gate

Floor tiles to the security including skirting

Cost on for the concrete apron wash stone

Entrance ramp to accass the ware house Basalt concrete

Block wall at a height of 0.66m heigth to the existing perimeter pence for security purpose

Finishing to Block wall at a height of 0.66m heigth to match the existing perimeter pence

Cost on the entrance roof shed

TOTAL WHARE HOUSE 3 CARRIED TO MAIN SUMMARY 

RENOVATION WORKS OF WAREHOUSE FINAL SUMMARY

Item                                                      Description
1                                                                 TOTAL WHARE HOUSE 1
2                                                                 TOTAL WHARE HOUSE 2
3                                                                 TOTAL WHARE HOUSE 3
TOTAL WHARE HOUSE 3 CARRIED TO FINAL SUMMARY