Consultancy, Rehabilitation of the Ministry of Justice, Annex building phase II 56 views
Job Overview
GENERAL INFORMATION
Services/Work Description: Rehabilitation of the Ministry of Justice, Annex building phase II Employer: Ministry of Justice
Contract Type: Consultancy, Expert Firm (Minor civil works) Duration: 4 months
Expected Start Date: February 2025
BACKGROUND
The Truth, Reconciliation and Reparations Commission (TRRC) was established in December 2017 through an Act of National Assembly, with a mandate to investigate human rights violations that occurred between July 1994 and January 2017. The Commission was given broad powers to gather evidence, hear testimony from witnesses and victims, and recommend measures to address the legacy of past abuses. The TRRC was also mandated to promote reconciliation and healing, and to make recommendations for reparations for victims and their families.
In November 2021, the TRRC submitted its final report to the Government, which included a wide range of findings and 265 recommendations geared towards addressing the legacy of past human rights violations. The TRRC recommendations include measures to ensure accountability, promote reconciliation and healing, and provide reparations for victims and their families. The recommendations include institutional reforms to strengthen the rule of law, enhance human rights protections, and ensure that state security agencies are accountable to the public. The TRRC also recommended the establishment of a reparations fund to provide financial and other forms of assistance to victims and their families.
The Government of The Gambia has committed in its White Paper on the TRRC recommendations to implement 263 of the TRRC recommendations, and in May 2023, developed an Implementation Plan to guide the process. The Implementation Plan aims to ensure that the TRRC’s recommendations are fully and effectively implemented, in a manner that is transparent, inclusive, and accountable. The Plan outlines the steps that the Government will take to implement the various recommendations and identifies the key stakeholders responsible for implementing them.
The Ministry of Justice (MOJ) has set up a Post TRRC Unit (PTU) that will be housed within the Ministry of Justice to serve as a Secretariat to the Steering Committee responsible for coordinating the implementation of the recommendations. The PTU requires a dedicated space to work from, therefore the Ministry of Justice requires urgent renovation and restoration works to preserve integrity of the existing building structure and enhance the working environment. This space is
anticipated to not only host the PTU, but interim teams working on post-TRRC issues, such as the SPO Advance Team, and NALA during a period of time as its premises are eventually rehabilitated.
SCOPE OF THE WORK
The Ministry of Justice seeks to engage services of a suitably qualified civil works firm to provide professional engineering services in accordance with common engineering practices, industry best practices, and global ISO standards. The main objective of proposed works shall include renovation of the exterior and interiors of the ground floor of the building.
The firm shall provide the following services:
- Clearing:
○ Complete clearance of the exterior to become suitable for landscaping, laying of concrete slabs extending the vehicle parking, outside container, and mosque areas. ○ Disposal of damages equipment and furniture within the premises, including offices. ○ Disposal and complete emptying of a 20 ft container on the site to be transformed into a storage/archiving space.
- Electrical Upgrades:
○ Install an appropriate electrical meter, if deemed necessary, to accommodate the building’s electrical load
○ Install additional power outlets in offices, kitchen, hallways, outside and the library for convenient access to electricity.
○ Repair and replace unworking lights in both the exterior and interior of the building and library, and install additional outdoor lights were deemed necessary.
- Water Accessibility:
○ Ensure water accessibility throughout the building, including plumbing works for all toilets, sinks and kitchen.
- Premises Paving:
○ Improve the outdoor premises by suitable paving (slabs) for enhanced aesthetics and functionality.
- Door and windows:
○ Replace all doors in the building, with locks, including any masonry work required in so doing.
○ Replace where necessary, otherwise repair windows and their locks to enhance security and ensure non-leakage of water during raining season.
- Kitchen installation:
○ Design and create a kitchen within the building for staff, with sink, sufficient electric outages to connect appliances, space for a stove and refrigerator and sufficient workbench and cabinets for storage.
- Toilet installations:
○ Design and install a men’s and women’s toilet (with two toilet cubicles each), including tiling, plumbing and installation of all fixtures.
○ Rehabilitate toilets in two ensuite offices, including replacement of toilet seats and sinks.
- Painting:
○ Apply high-quality, weather-resistant, and durable paint to both the interior and exterior of the building.
○ In case required, chipping and re-plastering of exterior of the building to ensure quality and durable paint (floor paint) application.
- Air conditioning and ventilation:
o Installation of 12,000 BTU air conditioners, and ceiling fans in 6 renovated offices and the library.
- Enhance security measures:
○ Build a security room suitable for two guards.
○ Installation of metal gate at main exterior access door.
○ Installation of metal grills to separate access between ground and first floor of the building, and to segregate the praying area from the parking space.
○ Build a shelter for trash containers, with metal grill gate to secure site.
- Conversion of 20ft container into a storage/archiving room:
o Installation of windows and a main, secure access door
o rehabilitation/installation of a roof
o installation of metal shelves alongside 3 of the container walls
o placing of concrete slab and steps to ease access into and out of the facility. o installation of electrical sockets, lights, and ceiling fans
INPUTS
The Contractor shall be fully responsible for all inputs, planning, managing and implementation of the scope of works bearing all risks and costs.
- The Contractor shall be responsible for the competency and capability of its personnel and shall have the capacity to manage works implementation independently.
- The Contractor shall source, procure, transport, and store all materials bearing all costs and risks.
- Contractor shall ensure effective supply chain planning & management to avoid delays during implementation.
- The Contractor shall develop a quality control plan and undertake regular self-audits to ensure:
- a) Works conform to MOJ requirements.
- b) Deter potential deviation in service delivery. Any deviations identified shall be corrected immediately before quality of works becomes unacceptable to MOJ. c) Ensure MOJ receives value for money.
- d) Ensure efficiency in their service delivery model.
- e) Ensure its personnel adhere to MOJ security advisory whilst on premises. 5. The Contractor shall assume full unequivocal responsibility for the performance of works in accordance with MOJ contractual documents, Industry standards & best practices, Global ISO codes and all other applicable Codes/Regulations. Works implementation shall follow a logical sequence.
- The Contractor shall not execute any works and/ or make any material changes during works performance unless specifically so authorized in accordance with the procedures ascribed in MOJ Contractual documents.
- Contractor shall take care to minimize spillages and/or debris pileups on site during work performance. Accumulations/spillages shall be cleaned up immediately to avoid safety hazards. Waste disposal shall be done in accordance with local environmental laws/regulations with contractors bearing all costs/risks.
- To the extent possible, work delivery during Regular Working Hours shall be carried out in a manner not to disrupt MOJ Office operations.
EXPECTED OUTPUTS AND DELIVERABLES
Deliverables / Outputs Estimated Duration Approving Authority
Design/as built drawings Within 1 week Solicitor General
Technical specification of Materials to be
used/Final Bill of QuantitiesWithin 2 weeks Solicitor General
Proposed work plan/actual delivery
scheduleWithin 3 weeks Solicitor General
Pictorial reports Month Solicitor General
Recommendation for maintenance works
to preserve repairs/upgrades.Within 3
monthsSolicitor General
Full performance of works Within 4
monthsSolicitor General
Final Invoices Within 4
monthsSolicitor General
Site clean-up prior to handover of works Within 4
monthsSolicitor General
INSTITUTIONAL ARRANGEMENT / REPORTING RELATIONSHIPS
The selected firm will report to and submit deliverables to the Solicitor General. The firm will be required to work closely with the Special Adviser on Transitional Justice and other members of the Post-TRRC Unit, who would provide guidance and assess the quality of the deliverables.
CONTRACTOR ELIGIBILITY
Contractor must be Limited Liability Companies duly registered with the Registrar of Companies and must have up to date filed Annual Returns with the Company Registry and Gambia Revenue Authority. In addition, the bidders must have a valid GPPA registration certificate. Contractor must submit three contracts of a similar nature previously carried out by the Contractor in the last 6 years.
DURATION OF THE WORK
The duration of this contract is for 4 months, commencing in February 2025.
QUALIFICATIONS REQUIRED FOR KEY PERSONNEL AND TEAM LEAD
To qualify, bidding firms are required to submit the CVs of each of their key personnel, who must have at least 10 years of work experience each in their area of expertise, as well as at least, a high school certificate. A team lead must be identified, with the following minimum qualifications, who will be fully dedicated to these works and act as the Ministry of Justice’s focal point with the firm.
- a) Academic Qualifications
- A bachelor’s degree in engineering or equivalent.
- b) Professional experience
- At least 6 years of experience leading similar projects.
- c) Competencies
- Communication
- Working with People
- Drive for Results
- d) Language and other skills
- Strong knowledge of English, including the ability to present clearly and concisely ideas and concepts in written and oral form.
- Capacity to communicate fluently with different stakeholders, and
Important Notes:
- Bidding firms are required to have the following professional and technical qualifications and only those who hold these qualifications will be shortlisted and contacted. Firms are strongly encouraged to include women, young people and/or Persons with Disabilities as part of their proposed teams.
- Bidding firms should contact the Procurement Specialist on 9926988 for site visit at least two (2) weeks prior to bidding deadline.
CONTRACT CONCEPT
The contractor shall submit a comprehensive and integrated design, bill of quantity (BOQ), specifications of the materials to be used, specifications of the equipment to be employed, and provide the total cost of the proposed construction and installation works.
It is envisaged that a single Contractor shall undertake all works prescribed herein. No partial bids shall be accepted.
Pricing: Bidder shall ensure transparency in the computation of BOQ unit prices. Proposed Contract pricing/unit cost structuring shall be:
- All costs inclusive excluding VAT. (VAT fees shall be listed as payable on the invoice on a separate line item but shall not be included in the contractual unit costs.)
- Pricing Approach: BOQ unit rates. Contractor shall carry out their own inspection and/or measurements to ensure their BOQ accurately reflects total costs for actual area. ●
EVALUATION CRITERIA AND METHODOLOGY
Tenders will be evaluated on administrative, technical, and financial criteria. All tenders will be initially subject to administrative evaluation. Only tenders that are administratively compliant will be scored on technical and financial criteria.
The Contractor must fulfill the following Eligibility Criteria:
Criteria Requirements
Registration Docs Provision of Business Registration and to date Annual Returns GPPA Registration Submission of copy of valid GPPA Registration certificate Previous Experience
Requirements
Provision of Business Registration and to date Annual Returns.
Submission of copy of valid GPPA Registration certificate.
Details of experience in execution of similar works within the past 6
years.
Following the bidder’s fulfillment of the Eligibility Criteria, their submission will then be evaluated Technically and Financially. Contract award shall be made to the bidder whose offer has been evaluated and determined as having received the cumulative highest score out of the following pre determined set of weighted technical and financial criteria specific to the solicitation.
Only candidates obtaining a minimum of 70% from the maximum available technical score (70 points) would be considered for the Financial Evaluation. The maximum number of points assigned to the financial proposal is allocated to the lowest price proposal and will be equal to 30. The proposal obtaining the overall cumulatively highest score after adding the score of the technical criteria and the financial proposal will be considered as the most compliant offer.
CONFIDENTIALITY AND PROPRIETARY INTERESTS
The Contractor shall not either during the term or after termination of the assignment, disclose any proprietary or confidential information related to the consultancy service without prior written consent. Proprietary interests on all materials and documents prepared by the consultants under the assignment shall become and remain properties of the Attorney Generals Chambers & the Ministry of Justice.
HOW TO APPLY
BID CLOSING DATE: 12 noon on 14th February 2025.
SUBMIT ALL 4 RFQ TENDER DOCUMENTS: (All documents shall be presented in English Language)
- Proof of Eligibility
- Detailed BOQ
- Drawings
- CVs of Engineers that will be working on the project.
Submit these in both hard copy at the Ministry of Justice Records Office, and electronically at the email address bids@posttrrc.com
Address to deliver application package
Mark sealed envelope with the title: Civil Works on the MOJ Annex Building Phase II Ministry of Justice
Marina Parade
Banjul, The Gambia
This TOR is approved by: Signature:
Date:
1/17/2025
Name and Designation: Ms. Ida Persson, Special Adviser on Transitional Justice